Plans detailing the works being carried out by Yorkshire Water with Peter Duffy contractors and Highways.

Work is now complete as per plans;

-separation of foul and clean water pipes and installation of new pipes to the goit. 

-work at Ydrissil to address flooding issues stemming from water coming down from the fields

-installation of pond to the rear of South farm

-work at the ford to replace the footbridge and improve drainage

-replacement of collapsed drain in the middle of the village

-amendments to curbs near to the telephone box to prevent water running down the road from entering the driveways

-cleaning of the goit

 

Thank you to all involved in the project, and to residents and land owners for their patience during these works